Skip to main content

Lay Out and Cut the First Stringer — Cut Stringers

Beginner2 mins

Part of project

How to Build Portable Deck Steps · Step 3 of 9

Helpful?

In this video

Obtain a 2x12 piece of lumber for the stringer. Using a framing square, carefully transfer the calculated rise and run dimensions onto the 2x12, marking all cut lines with a pencil. After marking, use a circular saw to meticulously cut along these lines to create the first stringer. This initial stringer is critical as it will serve as a template; use it to accurately trace and cut all subsequent stringers, ensuring consistency across the entire staircase.

2.7M views3.7K
Lowe's Home Improvement

1.3M subscribers

View Channel

FAQs

What are the most important safety precautions I should take when building these deck steps?

Always wear safety glasses when cutting lumber with power tools like a jigsaw, and use hearing protection. Be mindful of heavy lifting when handling lumber, and ensure your work area is clear to prevent tripping hazards. When attaching the steps, double-check that they are securely fastened and stable before use.

Besides basic hand tools, which specialized tools are essential for a beginner tackling this project?

A good measuring tape and pencil are crucial for accuracy. A construction calculator, like the Calculated Industries Construction Master 5, simplifies complex stair geometry. A jigsaw is vital for cutting stringers, and a drill/driver with appropriate drill bits will be used extensively for assembly.

How can I ensure these portable deck steps are stable and safe to use, especially on uneven ground?

Achieving stability is key. For a stable base on uneven ground, consider using concrete pavers or leveling blocks under the stringers, or the suggested permeable pavers, to create a flat and solid foundation. Ensure the steps are securely fastened to the deck using carriage bolts or heavy-duty screws, and always test for wobbles before regular use.

Are there alternative lumber choices for the treads and risers if the suggested 2x12 premium lumber and oak retreads aren't available or desired?

Yes, pressure-treated lumber (e.g., 2x10 or 2x12) is a common, cost-effective, and durable option for outdoor step treads and risers, though it may require a longer drying time before finishing. Composite decking boards also work well for treads, offering excellent durability and minimal maintenance. Ensure any alternative material is rated for outdoor use and strong enough to bear weight.

Transcript
Hide

remove the thickness of the Riser board off the back of the Stringer both situations remove the thickness of the tread from the bottom of the Stringer the third step is to lay out your first Stringer on a 2x2 with a framing square then cut it out using a circular saw you may use your first cut Stringer as a template to trace the remaining stringers the fourth step is to attach the stringers to the deck frame there are two methods that can be used you may attach the stringers to the

Auto-generated transcript. May contain errors.